Scaldingbaby1.jpg (2440 bytes)

Hot Water

logo_tapwater2.jpg (13034 bytes)
AAJ   L i t i g a t i o n   G r o u p
Vernon J. Petri Chairman

| Introduction | Tap Water Burn Resources |
|  The Litigation Process | Research Resources |
|
Defective Water Heaters |
|
Have a Case? | Join AAJ |

Third Degree

baby2.jpg (3288 bytes) Burns


Back

PRIORITIES OF ENGINEERING PRODUCT DESIGN/INSTALLATION

A. Design out all problems so that the product is fully functional, economical, attractive, and idiot proof. If all of these objectives are not fully satisfied, go to B.

B. Provide guards on the product to protect the inattentive, and if that is not fully possible, go to C.

C. Provide warnings of suitable number, size, shape, and message to get the attention of the inexperiences and/or uninitiated user, and if that is not fully possible, go to D.

D. Wear protective clothing for protection and/or to deflect the danger of a mishap, and if that is not appropriate, go to E.

E. Prepare training materials to include safety instructions, background information, all in plain language, in the form of data sheets, brochures, books, or videotapes.

Back

TapWaterHome2.jpg (3745 bytes)


Web Site Contents © 1998 - 2008 Vernon Petri & Associates


Law firm Web Site Design & Law Firm Marketing
Lawyer Web Sites
by Uriel Law Inc.